LNER Peppercorn Class A1 60163 Tornado

LNER Class A1 Peppercorn 60163 Tornado
Tornado on the East Coast Main Line in 2016
Type and origin
Power typeSteam
DesignerArthur Peppercorn (original designer)
BuilderA1 Steam Locomotive Trust
Build date1994–2008
Websitewww.a1steam.com Edit this at Wikidata
Specifications
Configuration:
 • Whyte4-6-2
Leading dia.3 ft 2 in (0.965 m)
Driver dia.6 ft 8 in (2.032 m)
Trailing dia.3 ft 8 in (1.118 m)
Length72 ft 11.75 in (22.24 m)
Width9 ft 2.875 in (2.82 m)
Height13 ft (3.96 m)
Axle load22.1 long tons (22.5 t; 24.8 short tons)
Adhesive weight66.55 long tons (67.62 t; 74.54 short tons)
Loco weight105.2 long tons (106.9 t; 117.8 short tons)[1]
Tender weight60.9 long tons (61.9 t; 68.2 short tons)
Total weight166.1 long tons (168.8 t; 186.0 short tons)
Fuel typeCoal
Fuel capacity7.5 long tons (7.6 t)
Water cap.6,000 imp gal (27,000 L)
Firebox:
 • Grate area50.0 sq ft (4.65 m2)
BoilerDiagram 118
6 ft 5 in (1.96 m) diameter
29 ft 2 in (8.89 m) length
Boiler pressure250 psi (1,700 kPa)
Heating surface:
 • Firebox245.3 sq ft (22.79 m2)
 • Tubes1,211.6 sq ft (112.56 m2)
 • Flues1,004.5 sq ft (93.32 m2)
 • Total surface2,461.4 sq ft (228.67 m2)
Superheater:
 • Heating area697.7 sq ft (64.82 m2)
Cylinders3
Cylinder size19 in × 26 in (480 mm × 660 mm)
Performance figures
Power output2,700 metric horsepower (2,000 kW; 2,700 hp)
Tractive effort37,400 lbf (166,000 N)
Career
Numbers60163 (display)
98863 (TOPS)
Official nameTornado
Axle load classRoute availability 9
First run29 July 2008
DispositionUnder overhaul. Approved for running on Network Rail track.

LNER Peppercorn Class A1 No. 60163 Tornado is a 4-6-2 steam locomotive completed in 2008 to an original design by Arthur Peppercorn. It is the first new build British mainline steam locomotive since 1960, and the only Peppercorn Class A1 in existence after the original batch were scrapped. In 2017, Tornado became the first steam locomotive to officially reach 100 mph (160 km/h) on British tracks in over 50 years.

After the project was founded by the A1 Steam Locomotive Trust in 1990, construction of Tornado began in 1994 and mostly took place at Darlington Works, with other components manufactured elsewhere. The project was financed through fundraising initiatives, public donations, sponsorship deals, and hiring out Tornado itself for special services. The locomotive was granted its mainline certificate in January 2009, having been designed in compliance with modern safety and certification standards.

The locomotive worked on heritage and mainline trains across Britain between 2008 and 2022, when it was withdrawn for overhaul.[2]

  1. ^ Cite error: The named reference RM50Greatest2008 was invoked but never defined (see the help page).
  2. ^ "Overhaul over-run explained". A1 Steam. 13 May 2022. Retrieved 21 June 2022.

From Wikipedia, the free encyclopedia · View on Wikipedia

Developed by Tubidy